Modify

Ticket #3409 (closed defect: worksforme)

Opened 20 months ago

Last modified 20 months ago

Zentyal upgrade fails from 2.0 to 2.2

Reported by: guillaume.espanel@… Owned by: cperez@…
Milestone: 2.0.X Component: base
Severity: normal Keywords:
Cc:

Description

Using the migration tool ( http://trac.zentyal.org/wiki/Documentation/Community/Migration), the upgrade fails during the second part of the process. I've fixed an Apache pem error ( http://forum.zentyal.org/index.php/topic,8263.msg34662.html#msg34662). And this error message shows up at the end of the upgrade process :

run-parts: ./post-upgrade/002_import_redis exited with return code 9

The error is circumvented by disabling and removing the DNS module before the upgrade.

We run Zentyal 2.0 on Ububtu server 10.04.

Attachments

Change History

comment:1 Changed 20 months ago by cperez@…

  • Owner changed from jacalvo@… to cperez@…
  • Status changed from new to assigned

Hi Guillaume,

Can you send me this file: /var/lib/ebox/redis_dump.yaml to cperez@…? For some reason your redis dump fails to import (probably this is a format problem). I will try to fix the issue.

Thank you and best regards

comment:2 Changed 20 months ago by jacalvo@…

  • Status changed from assigned to closed
  • Resolution set to worksforme

We can't reproduce this. I suppose this was already fixed after the first changes in the upgrade script, please reopen if you still can reproduce it with the final version. Thanks.

View

Add a comment

Modify Ticket

Change Properties
<Author field>
Action
as closed
The resolution will be deleted. Next status will be 'reopened'
Author


E-mail address and user name can be saved in the Preferences.

 
Note: See TracTickets for help on using tickets.